Testing Monitoring Inspection Assessment Supervising

Experience:

  • Supervision on the construction and erection of the road & railway “Zezelj” bridge over Danube in Novi Sad, DB Engineering & Consulting GmbH, Material Key Expert, 2017/18
  • Load testing of bridges on Highway E-763, sector Ljig – Preljina, 65 reinforced concrete and presressed bridges, Testing Project Manager, Central Road Laboratory, Novi Sad, 2016/17.
  • Road Rehabilitation and Safety Project, Emergency works component on the urgent maintenance and reparation on some sections of the state roads of Repablic of Serbia, Consulting service and supervision of work on the bridges – Structural/Bridge Engineer 1 (JV “NIEVELT – CPL”) 2016
  • Supervision on Construction of 11 Bridges as a Part of Highway E-60 Construction in Georgia, Section Urbnisi – Agara, Senior Expert for Bridge & Structures, Nievelt Ingenieur GmbH, Austria, (2012 – 2015)
  • Load Testing of Bridge over River Liakhvi near Gori, Georgia, JV Nievelt Ingenieur GmbH-Austria, VCE Viena Consulting Engineers ZT GmbH –Austria, CPL Central Road Laboratory, Novi Sad – Serbia, Principal Testing Engineer, (2013)
  • Testing of the bridge over river Sava near Obrenovac – during erection and proof load testing, Contractor – "Mostogradnja" Belgrade, Testing – Institute "Kirilo Savic" Belgrade, Consultant – Chief Testing Engineer, (2011-2012)
  • Supervision of Construction Works for Rehabilitation of Gazela Bridge in Belgrade, Contractor – "Strabag AG", Austria, Supervision JV CPV-VCE-Nievelt, Assistant Resident Engineer for Bridge, Nievelt engineer GmbH, Austria (2009-2011)
  • Bridges (6 reinforced concrete continuous frame,1 concrete box prestressed continuous girder erected by launching method - first time applied in Serbia) on Lot -5c, road M-21 (E-760), Borova Glava – Uvac (Serbia), Financed by EBRD, Bridge construction supervising according to FIDIC contract (Bridge resident engineer, 2005-2007)
  • “Duarte” suspension bridge (50 y. old) (95.31+175.58+95.31 m) in St. Domingo, Dominican Republic, Program for the bridge construction monitoring and controlling during process of reparation (Independent consultant, 2005)
  • Cable-stayed steel box bridge (2x60.0+351.0+2x60.0 m) over river Danube in Novi Sad, Inspection, and testing and integrity assessment of destroyed bridge (Chief testing engineer, 2001)
  • Suspension bridge (25 y. old) (30.76+154.60+30.76 m) over river Tisa in Kanjiza, Inspection, testing and bridge integrity assessment (Chief testing engineer, 2000)
  • Steel box continuous road bridge “Duga” (55.5+182+55.5 m) over river Danube in N. Sad, Monitoring, testing and quality of the construction work controlling, (Chief testing engineer, 2000)
  • Cable-stayed bridge (2x60+375+2x60 m) over river Visla in Poland, Program for the bridge load testing (coauthor) (Independent. consultant, 1999)
  • Concrete box prestressed continuous bridge (41.4+52.0+62.0+52.0+41.4 m) over river Morava on highway Belgrade-Nis near Jagodina, Inspection, load testing, risk based integrity assessment and bearing capacity evaluation of damaged bridge (Chief testing engineer, 1999)
  • Steel box continuous road bridge over river Sava (101.45+198.00+2x99.00+90.45 m) near Belgrade, Monitoring, testing and quality of the construction work controlling (Chief testing engineer, 1998)
  • Pedestrian cable-stayed steel box bridge St. Irinej (35+192.5+35 m) over river Sava in S. Mitrovica, Bridge load testing (Testing engineer, 1994)
  • Suspension steel pipeline/pedestrian bridge (17 y. old) (53.74+85.0+50.15+253.70+50.15+65.2 m) over river Danube in Smederevo, Inspection, testing and bridge integrity assessment and bearing capacity evaluation (Chief testing engineer, 1989)
  • Steel railway cable-stayed bridge (53.74+85.0+50.15+253.70+50.15+65.2 m) over river Sava in Belgrade, Bridge load testing (Testing engineer, 1981)
  • Cable-stayed steel box bridge (2x60.0+351.0+2x60.0 m) over river Danube in Novi Sad, Monitoring and quality of the construction work controlling during bridge erection, (Testing engineer, 1980)